A
-
Akhavan Niaki, Seyed Taghi
A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2012, Pages 198-207]
-
Aliabadi, Mohammad
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
-
Arivarignan, G.
Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011, Pages 80-106]
-
Arunkumar, Natesan
A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011, Pages 20-34]
B
-
Bhuiyan, Nadia
Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011, Pages 142-153]
-
Bijari, Mehdi
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011, Pages 107-119]
C
-
Chauhan, Stayaveer.S.
Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011, Pages 142-153]
-
Clark, Alistair
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011, Pages 107-119]
D
-
Damle, Siddharth B.
Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011, Pages 35-51]
-
Das, Nandini
Estimating Process Capability Indices Using Univariate g and h Distribution [Volume 5, Issue 2, 2011, Pages 120-127]
E
-
Eshghi, Kourosh
Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract [Volume 5, Issue 2, 2011, Pages 63-79]
-
Eydi, Alireza
Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2012, Pages 208-229]
F
-
Fallah Nezhad, Mohammad Saber
A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2012, Pages 198-207]
G
-
Ghalebsaz Jeddi, Babak
A Note on Runway Capacity Definition and Safety [Volume 5, Issue 4, 2012, Pages 240-244]
-
Ghassemi-Tari, Farhad
Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011, Pages 128-141]
-
Grantham, Katie
Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011, Pages 35-51]
H
-
Haji, Alireza
Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011, Pages 52-62]
-
Haji, Alireza
A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2012, Pages 230-239]
-
Haji, Babak
A Queueing-Inventory System with Repair Center for Defective Items and One-for-One Ordering Policy [Volume 5, Issue 4, 2012, Pages 230-239]
-
Haji, Rasoul
Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011, Pages 52-62]
J
-
Javazi, Leila
Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand [Volume 5, Issue 4, 2012, Pages 208-229]
-
Jenabi, Masoud
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
-
Jolai, Fariborz
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
K
-
Karunamoorthy, Loganathan
A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011, Pages 20-34]
M
-
Mahdieh, Masoumeh
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line [Volume 5, Issue 2, 2011, Pages 107-119]
-
Masihabadi (1985-2011), Sina
Coordinating a Seller-Buyer Supply Chain with a Proper Allocation of Chain’s Surplus Profit Using a General Side-Payment Contract [Volume 5, Issue 2, 2011, Pages 63-79]
-
Mehdizadeh, Esmaeil
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times [Volume 5, Issue 1, 2011, Pages 1-19]
-
Murray, Susan L.
Development of a Generic Risk Matrix to Manage Project Risks [Volume 5, Issue 1, 2011, Pages 35-51]
-
Muthukumar, Sambandam
A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process [Volume 5, Issue 1, 2011, Pages 20-34]
O
-
Omranpour, Zohreh
Development of PSPO Simulation Optimization Algorithm [Volume 5, Issue 3, 2011, Pages 128-141]
P
-
Pourghannad, Behrooz
An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011, Pages 154-174]
R
-
Rajkumar, M.
Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011, Pages 80-106]
S
-
Sadegheih, Ahmad
A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming [Volume 5, Issue 4, 2012, Pages 198-207]
-
Saffari, Mohammad
Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy [Volume 5, Issue 1, 2011, Pages 52-62]
-
Safi, Mahsa
Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2012, Pages 185-197]
-
Sajadifar, Mehdi
An Integrated Model for a Two-supplier Supply Chain with Uncertainty in the Supply [Volume 5, Issue 3, 2011, Pages 154-174]
-
Sharifi, Shahram
Part-level Sequence Dependent Setup Time Reduction in CMS [Volume 5, Issue 3, 2011, Pages 142-153]
-
Shavandi, Hassan
The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011, Pages 175-184]
-
Sivakumar, B.
Continuous Review Perishable Inventory System with OneSupplier, One Retailer andPositive Lead Time [Volume 5, Issue 2, 2011, Pages 80-106]
-
S.Monfared, M.A.
Efficiency Analysis of Public Universities in Iran Using DEA Approach: Importance of Stakeholder’s Perspective [Volume 5, Issue 4, 2012, Pages 185-197]
T
-
Taghavi, Majid
The P-Center Problem under Uncertainty [Volume 5, Issue 3, 2011, Pages 175-184]
Your query does not match with any item